Kirkwood Mountain Resort

WBS completed design and construction oversight of the asphalt grindings mitigation project in the fall of 2016. This involved slope stabilization, and floodplain and channel protection and stabilization. Design of these projects was approved by all jurisdictional agencies in record time and work was completed before winter storms closed access.

We are continuing our work with monitoring of the very successful 2016 erosion control treatments. In addition we are now tasked with new slope stabilization treatments and meadow restoration where asphalt grindings were placed on the slopes and piled in the wetlands adjacent to the creek. This new work should be completed in the fall of 2017.