Landscape and Aesthetic Design for the I-80 Carlin and I-80 Elko Interchanges
For LAGE Design. Elko County. 2022 – on going. In 2023 WBS conducted extensive baseline vegetation surveys and soil analysis for several interchanges at both locations to inform the erosion control and revegegation specifications. These specifications accompany the construction of landscape features. The projects are scheduled for construction during the summer of 2024, with WBS overseeing the erosion control and revegegation work in the fall of 2024. WBS is also under contract to monitor the success of the treatments for two years post-construction.