Phase 3B of the Truckee River Legacy Trail connects the Glenshire Subdivision to the Truckee River Regional Park. Over 2 miles of trail travels from the existing Phase 3A trail, between the Tahoe-Truckee Sanitation Agency Waste Water Treatment Plant and the Truckee River, across Martis Creek, up the talus slope, along an existing utility access road, and to Glenshire Drive. The trail travels south of the Truckee River through property owned by the USFS, Tahoe-Truckee Sanitation Agency, and Town of Truckee.
As a sub to Lumos and Associates, WBS developed specifications for erosion control and revegetation along ROW, developed wetland mitigation specifications, and over saw implementation work.