top of page
Upper Truckee River Middle Reach Restoration Project
City of South Lake Tahoe, CA. Starting in 2004, WBS conducted extensive botanical, sensitive species, noxious weed and re-ueable resource surveys.Designed restoration and bank stabilization plans and specifications for new reaches of the river, floodplain, and associated construction located adjacent to the South Lake Tahoe airport. Assisted with RFIs, change orders and field directives and reviewed all relevant submittals. Provided construction oversight and vegetation monitoring services. Provided post-construction monitoring services in 2013.
bottom of page